DIRECT ANSWER

Confirm the use before the specification

Coordinare rete, ambiente stradale e manutenzione.

Bring the application, site conditions and delivery requirements into the decision so the quotation can be built around a real project.

READING NOTES

01

Confermare lo scopo

Definire delimitazione o accesso con autorità e progettista; non presumere che la rete trattenga veicoli.

02

Rilevare il percorso

Registrare pendii, fossi, tombini, incroci, ingressi, impianti, livelli e svolte.

DECISION TABLE

Confirm the parameters against the project

Start with the application, then carry the required checks into the enquiry.Swipe horizontally on mobile to view the full table
Decision areaWhat to assessConfirm in the enquiry
ApplicationDefine the actual applicationEnvironment, function and installation
SpecificheConfirm product and dimensionsMaterial, specification, quantity and tolerance
ConsegnaAlign packing and destinationTiming, packing, drawings or photos
03

Risolvere interfacce

Valutare visuali, drenaggio, fondazioni, reti e manutenzione. Usare dettagli specifici nei punti particolari. Separare pezzi correnti, transizioni, angoli, estremità e cancelli per tratto. Confermare tracciato approvato e comunicare modifiche con disegni revisionati.

QUOTE CHECKLIST

Prepare for a quote

  • Application and safety level
  • Total run and segments
  • Fence height and opening
  • Wire and finish
  • Posts, spacing and footing
  • Gates, corners and terrain
  • Quantity, packing and destination
  • Drawings, photos and lead time

KEEP READING

Articoli correlati

Guide all’acquistoRicambi per recinzioni e retiIdentificare collegamenti critici e scorte compatibili.→ImpieghiRecinzione industriale: angoli, cancelli e fondazioniCoordinare tracciato, attività, strade e terreno.→ImpieghiRecinzione paesaggistica: pannelli verdi e pali tondiVerificare rete, cappucci e bulloni come insieme.→