Benvenuti da WOAN
Preventivo →
Lingua
Lingua
WhatsAppPreventivo
DIRECT ANSWER

Confirm the use before the specification

Concordare protezione, etichette e pallet con le specifiche.

Bring the application, site conditions and delivery requirements into the decision so the quotation can be built around a real project.

READING NOTES

01

Rischi

Proteggere diametro ed estremità dei rotoli, pannelli da pieghe e urti, accessori da mescolanze e omissioni.

02

Condizioni

Definire pezzi per collo o pallet, paraspigoli, pallettizzazione, etichette, marcature e neutralità. Considerare peso e accesso carrello a destinazione.

DECISION TABLE

Confirm the parameters against the project

Start with the application, then carry the required checks into the enquiry.Swipe horizontally on mobile to view the full table
Decision areaWhat to assessConfirm in the enquiry
Roll deliveryRoll diameter, protected ends and pallet formQuantity per bundle, labels and corner protection
Panel deliveryBending, abrasion and corner impactPallet, stacking and handling
Project loadingZones for panels, posts, fittings and gatesDestination, container and packing list
03

Distribuzione

Per pannelli, pali, fissaggi e cancelli identificare zone e quantità nella distinta, distribuendo secondo montaggio.

04

Conferma

Chiedere schema, volume previsto e proposta container prima dell'ordine, evitando di risolvere danni e incompatibilità soltanto dopo il trasporto.

QUOTE CHECKLIST

Prepare for a quote

  • Application and safety level
  • Total run and segments
  • Fence height and opening
  • Wire and finish
  • Posts, spacing and footing
  • Gates, corners and terrain
  • Quantity, packing and destination
  • Drawings, photos and lead time

Domande

What should be confirmed before ordering?

Do rolls and panels have the same packing risks?

No. Rolls need protected diameter and ends; panels need protection from bending, abrasion and corner impact.

Should packing be part of the order?

Confirm quantity per bundle, pallets, corner protection, labels and marks at order stage.

How can mixed project materials stay organised?

Use zone and installation-order marks and show each zone's quantity on the packing list.

KEEP READING

Articoli correlati

Consegna per exportFilo a lame: imballo e carico per esportazioneCoordinare rotoli, vincoli, umidità e movimentazione del container.→Guide all’acquistoRevisione disegni: misure, fori e orientamentoCreare un riferimento unico per produzione e controllo.→Guide all’acquistoRichiesta di rete su misuraIndicare uso, misure, materiali, quantità, disegni e tempi insieme.→